The HSE L8 Approved Code of Practice states that cooling towers should be cleaned a minimum every 6 months and that where possible drift eliminators and pack should be removed for cleaning and inspection.

The Premier (C&D) Ltd cleaning regime consists of the following

  • Pre-chlorination prior to commencement of cleaning in accordance with HSE L8 guidelines
  • Removal, where possible, and cleaning of drift eliminators
  • Cleaning of distribution systems
  • Removal, where possible, and cleaning of pack
  • Draining and cleaning of sump
  • Post chlorination in accordance with HSE L8 guidelines
  • Written report left on site and a follow up “Cleaning & Disinfection Report” complete with photographs before and after clean produced