Natural Systems Utilities (NSU)
- Home
- Companies
- Natural Systems Utilities (NSU)
- Services
- Design-Build-Operate Services
Design-Build-Operate Services
NSU combines the roles of designer, engineer, constructor and operator of water, energy, and wastewater reclamation infrastructure components in a seamless multi-discipline Design-Build-Operate (DBO) to our customers. Working together with operations during startup allows for a smooth transition and successful operation. Beyond the significant reduction in capital costs, these alternative procurement techniques have demonstrated, there are other important benefits to clients over the more traditional design-bid-build approach.Most popular related searches
landfill leachate treatment system
wastewater energy
communal waste
wastewater system
wastewater recycling
wastewater treatment
landfill leachate
leachate treatment system
landfill leachate treatment
landfill leachate system
- A fully-integrated, single source for planning, permitting, design, construction, operation and ownership of water/wastewater systems streamlines a client’s need to arrange for, and integrate the efforts of a variety of vendors.
- Highly qualified engineers and designers receive real world input from our construction and operations staff during the design process, ensuring that efficient and economical considerations are factored into both construction and long-term operation.
- Our construction division has full access to the process engineering team and operations groups, allowing a critical give-and-take relationship during design and construction phase, shortening the overall project schedule, one of the chief benefits of design-build projects.
- Our operators have hands-on experience in a broad range of water, wastewater, energy, and residuals technologies. In particular, NSU has been recognized for work with an assortment of MBR treatment facilities and biogas.
NSU has provided a number of clients with DB, DBO, and DBOO wastewater treatment and reuse facilities. Among them are:
- Warren Township Sewerage Authority in Warren New Jersey;
- Mapleton, a residential development in Mansfield, New Jersey;
- A residential and commercial development by the Environmental Disposal Corporation in Bedminster, New Jersey;
- Six new apartment buildings containing a total of 1,800 units at Battery Park City in New York;
- The New England Patriots’ Gillette Stadium in Foxboro, Massachusetts.
- Ridgewood Sustainable Energy Project in Ridgewood, New Jersey;
- Monmouth County Landfill Leachate Pre-treatment System in Tinton Falls, New Jersey; and
- Forest County Potawatomi Community Waste-to-Energy facility in Milwaukee, Wisconsin.
