Biral pumps work extremely reliably. We support you during commissioning so that your pump works correctly from the start.

Most popular related searches

In order to be able to guarantee smooth and timely commissioning, the following points / work must be completed and checked beforehand by the installer:

  • The pump, controller, control elements and level regulator are properly connected (by an electrician).
  • Connection cables (pump, level controller ) must not be shortened .
  • Pumps must be installed in accordance with the Biral installation instructions, ie they must be expandable at any time .
  • Shafts must be completely cleaned before the first filling (no construction waste).
  • Correct attachment and setting of the level controller according to the Biral installation instructions.
  • There is sufficient water available for commissioning.
  • The contact person is on the system (instruction if possible to operator).
  • Assembly and operating instructions are available.

Commissioning cannot be performed if the conditions mentioned are not met. We reserve the right to issue an invoice for any activities resulting from systems that are not operational at the time of commissioning.