Noise Barriers Planning Services
The planning develops from the regulations sector, where the firm`s managers participated to the drawing up of some decrees of the Legge Quadro (Framework Law), by whose experience the main procedure lines have been defined: quantification of the Ante-Operam acoustic climate, detailed characterization of the sources, choice and setup of the simulation model, anticipatory Post-Operam analysis, dimensioning, architectural study and structural planning of the acoustic mitigations interventions. At working plan stage, besides the technical and security issues, VDP is in continuous search for suitable solutions both for the production stage (detailed project for setting up of the building site) and the optimization of the work`s perceptual and social integration, focusing on shape and image. As a final process VDP performs post-operam acoustic inspections according to methodologies and specifications of ANAS, RFI and highway Companies.
