ZETICA
  1. Companies
  2. ZETICA
  3. Services
  4. Trackside - Ballast Condition Surveys

Trackside - Ballast Condition Surveys

FromZETICA
SHARE

Rail track defects are often caused by poor ballast conditions. Zetica surveys provide objective information on track ballast condition that helps cut the costs of maintenance and renewals. Zetica scans track ballast condition at high speed using train-mounted multichannel GPR equipment linked to positioning systems and integrated with the results of track geometry surveys.

Most popular related searches

The stability of the survey platform and repeatability of the data facilitates automatic processing and integration with track geometry data to forecast ballast renewal, formation renewal and track maintenance.

  • Mapping changes in ballast thickness at normal train speeds
  • Mapping changes in ballast quality at normal train speeds
  • Benchmarking of ballast condition
  • Repeat scans of track to target changes in ballast condition or sub-ballast characteristics
  • Automatic processing of the output allowing integration with existing decision support tools
  • Raw data available for future processing