CWF GmbH

Vario Solutions

SHARE

Special solutions for special requirements. Because of the growing number of converting areas we develop and offer customized building structures for special projects. Restrictions to construction activity, such as very short piling depths or general piling interdiction in the soil can be taken into account by using Vario solutions.



Post reinforcement for horizontal loads

  • North-South & East-West orientation possibleh
  • Ballast footing
  • E.g. project-related concrete footings
  • North-South & East-West orientation possible

Post reinforcement to prevent terrain lowering

  • North-South & East-West orientation possible

Terrain-specific solutions

  • 2-post-system
  • terrain parallel construction
  • floor clearance 0,4 - 1,0m