Züblin Umwelttechnik GmbH
  1. Companies
  2. Züblin Umwelttechnik GmbH
  3. Services
  4. Water Treatment Plant Construction ...

Water Treatment Plant Construction Services

SHARE

As part of the modernization work in the Bonatzbau, the historic part of Stuttgart`s main railway station, Züblin Umwelttechnik is providing a plant for treatment of construction water. The historic Bonatzbau in Stuttgart is currently being completely modernized. Access to the tracks of the new platform hall, two new levels for stores and a modern four-star hotel are being created.

Most popular related searches

Sector/client

  • Ed. Züblin AG

Particularities

  • Space-saving installation of the system components
  • Use of the complete modular system

Characteristics

  • Flow rate
    • 5 L/s construction water
  • Three construction sites with a total of 14 pumps

Services offered

  • Components
    • Sedimentation tank 30 m³
    • Lamella separator
    • BW-KOMPAKT (modular system)
    • BW-FLOCK (modular system)
    • BW-AUTOMATIK (modular system)
    • NEUTRA-KOMPAKT (modular system)
    • pH, conductivity, temperature and turbidity measurement
    • Flow measurement in inlet & outlet
    • PLC, data management, fault message system, monitoring
    • Data management

Service period

  • Since July 2023