Datgel - Version gINT -Monitoring Software Tool
Now you can link your monitoring data with the rest of your subsurface data and manage it in one complete database. The Datgel Monitoring Tool gINT Add-In will improve the recording, interpretation and reporting capabilities for groundwater and displacement monitoring.
Key Benefits
- Replace oversized excel worksheets with an off the shelf database solution
- Store monitoring info in a central database
- Automate monthly reporting, together with the Datgel Output Tool
- Present geology data beside monitoring results
Features in Summary
- Installation construction details for each instrument type
- Automatic calculation of the monitored results
- Select base readings
- Automatic calculation of the change from the base reading and between each reading
- Consistency through reporting on standard forms
- Support for US Customary/English and Metric/SI units
- 81 reports, in A4/A3 and Letter/11x17 page sizes
Instruments Included
- Standpipe and Vibrating Wire Piezometer
- Settlement Marker, Total Station and Deep Datum
- Inclinometer
- Rod Settlement Gauge
- Magnetic Extensometer
Packages
- Professional includes all instruments
- Piezometer includes Standpipe and Vibrating Wire Piezometer
New in Version 3.2
- Features of the Datgel Administrator Tools included: AGS Format Tool, Convert Projects Tool, Export Tool, Find or Set Property Tool, Import Correspondence File to Field Map Tool, Lookup List Check Tool and SQL Tool.
- Import Tool
- .NET 4.8 and code optimisation
New in Version 3.1
- New Letter size reports
- Multiple additional Vibrating Wire Piezometer pore pressure formulas
- Support for US Customary/English and Metric/SI units
New in Version 2.1
- New output options to define Minimum and Maximum scale values in reports
- Support for SQL Server
- Inclinometer Checksum, Cumulative Deviation and Incremental Displacement Reports
Settlement Marker, Total Station and Deep Datum installations can be recorded, you can pick the base readings and can calculate the elevation and changes in displacement for each reading.
The supplied range of standard reports for the displacement installations include installation logs, a monitoring record table and a settlement versus time graph report.
The Inclinometer Module of the Monitoring Tool allows you to copy-paste in raw data, calculates derived results, and to easily create inclinometer-based log reports together with geology data.
Key Features
- Plots Cumulative Displacement versus Depth/Elevation
- Plots Incremental Deviation versus Depth/Elevation
- Installation Log detailing Soil/Rock description, Construction details, and material graphics
The Datgel Monitoring tool allows for complexities of the instrument making your life just a little bit easier.
- Storage and presentation of installation and magnet location data
- Storage of readings by set
- Calculate changes from base and previous reading
- Calculate `relative to datum magnet` or `relative to top of protective casing`
- Add additional magnets as the fill level rises
Standpipe and Vibrating Wire Piezometer such and associated details such as screen intervals, response zone, backfill materials and any reductions in the diameter of the hole with depth are managed by the tool.
The monitoring tool calculates the groundwater depth and elevation, water head, pore pressure, and change in elevation from base and previous readings. There are five vibrating wire pore pressure formulas. Where the ground level surrounding the installation may vary over time (for example on a reclamation or landfill site) the tool can automatically calculate the true elevation levels of the groundwater.
The supplied range of reports for the groundwater installations include installation logs, a field monitoring sheet, a monitoring record table and water level versus time graph reports.
Rod Settlement Gauge installations and the surrounding fill levels at the time of installation can be entered. Based on this information, the surveyed readings of the settlement gauge and the fill levels are used to determine the change in elevations and the resulting settlement values are returned.
The supplied range of reports for the Rod Settlement Gauge installations include an installation log, a table of readings and a graph report showing settlement and fill thickness versus time.
General tools are included to help you efficiently process data.
- AGS Format Tool
- Convert Projects Tool
- Export Tool
- Find or Set Property Tool
- Import Correspondence File to Field Map Tool
- Import Tool
- Lookup List Check Tool
- Restore Default Values
- SQL Tool
- Unit Conversion
