Omega AS
  1. Companies
  2. Omega AS
  3. Software
  4. Omega 365 - Project Completion Handover ...

Omega 365Project Completion Handover Tracking Software

SHARE

Ensure Smooth and Timely Handovers; A globally proven tool, flexible enough to support any handover strategy, easy to use, and designed to enable verification and tracking of project progress.

Most popular related searches

Ensure projects meet strict quality standards and are handed over efficiently. This product provides a structured approach to testing, handover, and commissioning, supporting a smooth transition from the initial phases through to project completion.

Testing and Handover
Establishing a clear strategy for testing and handover early in a project is crucial for success. This approach ensures timely and efficient handovers of predefined packages, facilitating a seamless transfer of scope between construction, commissioning, and operations, while minimizing delays and disruptions during critical transitions.

Manage Scope
When the scope is divided into manageable, commissionable packages, the completion process enables progressive verification of physical progress in line with installation activities. In the event of guarantee claims, the solution offers full traceability of both installation and testing, from the overall project level down to individual checklists. Integration with scope scheduling enables teams to efficiently create commissioning and handover schedules, ensuring seamless alignment between execution and completion.

Integrated Asset Management
The system manages the entire completion and handover process, from supplier through fabrication and installation, to final ownership. By utilizing the Asset Management product, the handover process is further streamlined, as everything is handled within one integrated solution, ensuring a seamless transition to operations.

Scope Visualization in 3D Viewer
Visualize the entire scope of work for your project or asset with our data-connected 3D viewer. Leverage a single source of truth for both planned and ad-hoc tasks throughout the project lifecycle. Extract and view all project and asset data within Omega 365, ensuring comprehensive and up-to-date scope management.

Project Explorer

Pims Completion Management`s Project Explorer offers a tree-structured system view which displays the status of completion at any level, checklists completed and outstanding, punch lists details, and subsystems ready to be handed over.

Users can drill down from a high level to their desired level and multiple structures are available which can be tailored to the needs of various users and project phases.

Project Explorer provides graphical charting and links to relevant status reports, documentation and file attachments.

Pims provides a suite of predefined checklists. The checklists are easily configurable by the administrators and project specific checklists can be added quickly.

All checklists are available in electronic format (e.g. iPad) or paper based with barcodes. 

Using the tablet option users can easily document status of inspection by taking pictures and signing the checklists electronically.

Paper-based checklists are designed to be scanned (via pdf). The system will detect the barcode and automatically update the status along with any attachments. The printing of checklists is made more efficient by allowing the user to print batches of checklists based on system, discipline, tag number and other configurable fields.

Pims comes with a highly configurable punch module. Punch items can be cleared electronically, in paper form or based on barcodes. Punch items can also be imported from external sources such as MS Excel.

Several graphical and tabular reports are available in Pims that show trends and status at the desired levels.

The Project Look Ahead gives the user a visual representation of the work ahead by combining the planned handover dates and the completion status in the system. Color coding and punch indicators are available for easy indications of any show stoppers. The project look ahead has been proven to be a very useful tool in weekly team meetings to follow up progress and contractors.

Pims Commissioning procedures combines the latest status from the database with written procedures. Completion of commissioning activities can be done using tablets in the field, enabling both progress reporting and increasing the visibility of field execution.

Procedures can combine various information and reports such as; lists and descriptions of prerequisites, inline reports, activity lists, checklists and other attachments.

Pims supports the handover of single, multiple or part subsystems. Handovers can be performed electronically or in hard copy.

The system will help you with generating the handover documentation and can include:

  • Certificates
  • Handover checklists
  • Reports (e.g. outstanding punch)
  • Drawings and documents
  • Checklists with attachments
  • Additional attachments

Pims offers a very rich and efficient user interface giving the administrators several options for quickly setting up the project including: 

  • Import of data from sources like Excel, Access, CSV files 
  • Mass update functions within the system 
  • Automatic setup based on rules and tag function codes 

Subsystems can be broken down into completion packages, containing one or multiple disciplines. The definition of completion packages makes it easier to ensure progressive handovers.