  • Creek Channel & Floodplain Restoration Project - Case Study

    Creek Channel & Floodplain Restoration Project - Case Study

    The ERC & Burgess & Niple team was selected as the design-build team to complete the design, permitting and construction work along Turtle Creek. The scope of work included the removal of a failing sheet pile wall, clearing and grubbing, excavation/embankment, re-alignment of the stream, installation of instream structures and rip-rap slope protection.  During the removal of the ...

News

Equipment & Solutions

  • Mercury-Contaminated Soil Remediation Plant
    Showcase

    Mercury-Contaminated Soil Remediation Plant

    Remediation of mercury contaminated industrial site for future expansion of industrial area. 70,000 tons of mercury contaminated soil and building rubble have to be cleaned in an industrial facility in the south of France until 2013. For the realization of this remediation work, an econ industries VacuDry® 12,000 has been in operation since early 2011. After the treatment the mercury free ...