Remediation Services

Articles & Whitepapers

  • Sub Slab Depressurization (SSDS) Installation- Case Study

    Sub Slab Depressurization (SSDS) Installation- Case Study

    ERC was hired as the General Contractor to install a sub-slab depressurization system (SSDS) in a 533,000-square foot active facility.  The SSDS was designed by Hull & Associates to address the chemicals of concern (COCs) detected in the soil beneath the existing building slab. This system included trenching, installing 1,157` of horizontal pipe, vacuum blowers, 10 sub-slab extraction ...

  • Remediate former service station - Case Study

    Remediate former service station - Case Study

    ERC was hired as the General Contractor for this project to remediate the former service station.  Gasoline underground storage tanks (USTs) were previously removed however historical releases ...

News

Equipment & Solutions

Upcoming Events

  • PestWorld 2020
    Showcase

    PestWorld 2020

    Every year, NPMA gathers thousands of pest management professionals from across the globe to offer opportunities for information sharing, provide access to the latest products, services, and technologies in the 100,000 square foot exhibit hall, and generate critical thinking in world-class educational sessions.