Dragflow S.r.l.

HY300 hydraulic pump on a construction site in Pavia - Video

SHARE

The purpose was to move the Ticino river from the right bank to the left bank, as well as the subsequent construction of a defense work for the regularization of the river. The goal was to allow the floating pontoon bridge to function correctly, which today rests half on sediments.

Most popular related searches