Desulfurization Wastewater
Articles & Whitepapers
-
Selenium Measurement at Flue Gas Desulfurization Wastewater Treatment Pilot Plant
The U.S. EPA, under the Clean Water Act, establishes Effluent Limitation Guidelines (ELG). On August 31, 2020 the EPA issued a finalized version to the Stream Electric Power Generating category (40 CFR Part 423). This finalized version added numerical limitations on several pollutants and waste streams. One waste stream of interest is flue gas desulfurization (FGD) wastewater. FGD waste streams ...
-
What kind of service Jiarong provide?
Jiarong- headquartered in Xiamen, China- was founded in 2005. We are a specialist in industrial membrane separation process. The core technology of Jiarong includes Disk-tube RO membrane system, ...
News
-
Removing heavy metals from power plant wastewater to meet EPA regulations
Two Environmental Protection Agency (EPA) regulations, intertwined and consistently in flux, are having an impact on waste streams in power plants. Important power plant wastewater regulations include Effluent Limitation Guidelines (ELGs) for ...
Equipment & Solutions
-
Showcase
High Head Slurry Pump
H series high head slurry pumps are end-suction, split-case, centrifugal slurry pumps provide excellent wear life while maintaining efficiency during the wear cycle providing the best total operating cost. This series are widely used in industries, such as Ball mill discharge Rod mill discharge, Ni acid slurry, Coarse sand, Coarse tailings, Phosphate matrix, Minerals concentrate, Bottom/fly ash, ...