Penstocks | Environmental XPRT
Articles & Whitepapers
-
Ironmacannie Mill, Scotland - Case Study
This turbine was installed by Border Hydro Ltd at a mill that was converted into a residence in Scotland. The turbine is a CMC-MH unit operating on 18ft of head at 2.6 Kw with a poured concrete basin to ensure the draft tube is always submerged to maintains suction head. The penstock pulls water from an existing dam and discharges below the ...
-
Project Klemtu Hydro British Columbia, Canada - Case Study
Statistics: Turbine: 0.61 m two nozzle Pelton Generator: 600 KW Kato @ 900 RPM Rated head: 220 m Rated flow: 0.33 m3/sec This facility provides power to a remote village on the West Coast of ...
News
-
Danish wastewater plant opts for actuator automation using CK Centronik modular actuators
Rotork CKc actuators provided the customer with a robust and reliable solution together with a reduced maintenance requirement. Our local Danish partner Fagerberg AS ordered isolating duty CKc actuators to be installed by Holsted Smedie at Lolland ...
Equipment & Solutions
-
Showcase
Flow Meter for Pipes, Open Channels and Water Bodies
Allows high accurate flow measurements using the transit time method according to IEC 60041 for part filled and full pipes, open channels and water bodies. Up to 8 measurement paths.