Penstocks | Environmental XPRT
Articles & Whitepapers
-
Propject Zeballos Lake Hydro British Columbia, Canada - Case Study
Statistics: Turbines: Main powerhouse: two 770mm Horizontal Francis Fish flow powerhouse: one 540mm Horizontal Francis Generators: Main powerhouse: two 10000kW WEG @ 720 RPM Fish flow powerhouse: one 3400kW WEG @ 900 RPM Rated head: 222.4m for 770mm turbines and 172.4m for 540mm turbine Rated flow: 5m3/sec for each 770mm turbine and 1.88m3/sec for 540mm turbine Commissioned: ...
-
Project Klemtu Hydro British Columbia, Canada - Case Study
Statistics: Turbine: 0.61 m two nozzle Pelton Generator: 600 KW Kato @ 900 RPM Rated head: 220 m Rated flow: 0.33 m3/sec This facility provides power to a remote village on the West Coast of ...
News
-
Danish wastewater plant opts for actuator automation using CK Centronik modular actuators
Rotork CKc actuators provided the customer with a robust and reliable solution together with a reduced maintenance requirement. Our local Danish partner Fagerberg AS ordered isolating duty CKc actuators to be installed by Holsted Smedie at Lolland ...
Equipment & Solutions
-
Showcase
Open Channel Flow Meter
The FlowCERT open channel flow meter provides comprehensive flow monitoring with data logging and control functions for a complete range of flumes and weirs. It is compatible with a range of sensors in order to create a flow metering system to suit your application.