Well Dewatering | Environmental XPRT

Articles & Whitepapers

  • Karowe Mine Groundwater Flow Model and Predictive Dewatering Simulations - Case Study

    Karowe Mine Groundwater Flow Model and Predictive Dewatering Simulations - Case Study

    Project Description Karowe Mine, located approximately 16 kilometers (km) southwest of the town of Letlhakane, is a diamond mine where the second largest diamond ever found on record, with a weight of 1,111 carats, was discovered. This project involved simulating mine dewatering and excavation to evaluate future dewatering requirements, as well as providing guidance for future monitoring bore

News

  • Safe and Effective Coal Ash Dewatering Project History

    Safe and Effective Coal Ash Dewatering Project History

    Not only for EPA compliance, but to maintain the integrity of your excavations and to stay on schedule and within budget. Project Background The project consisted of lowering the groundwater and dewatering the coal ash basin to allow for the ...

Equipment & Solutions

  • Vertical Spiral Screen
    Showcase

    Vertical Spiral Screen

    The CleanFlo™ Vertical Spiral Screen is a small flow screen specifically designed in a vertical orientation for installation in pump wetwells or short channels. The screen is composed of a cylindrical perforated or wedgewire basket with an integral shaftless spiral and conveyor tube.