- Home
- Companies
- NIVUS GmbH
- Applications
- Wastewater Treatment Plant - Discharge ...
Wastewater Treatment Plant - Discharge Area solutions for Partial Discharge Section Flow Measurement - Water and Wastewater - Water Treatment
FromNIVUS GmbH
Application: Pipe DN 500, made of stainless steel. Full filled. Service water tapping and feeding point.
Most popular related searches
wastewater treatment plant
wastewater treatment
ball valve
water treatment
flow monitoring
discharge flow monitoring
partial discharge monitoring
pipeline integrity
wastewater plant
wastewater treatment system
- For secondary clarification control a partial discharge of the WWTP needs to be measured
- Recorded values shall be forwarded to control system
- A transit time measurement system Type NivuSonic using 2 measurement paths has been used.
- The sensors have been installed in a measuring pipe with integrated ball valves. This allows to replace sensors under process conditions at any time.
- Crosswise path arrangement virtually eliminates crossflow during calculation.
- Easy and robust installation using calibrated pipe segment
- No bypass required
- High accuracy and reproducibility
Stay in the loop!
Select your areas of interest to receive industry updates.
