Altek for Harsco, Bahrain - Case Study

SHARE
Nov. 5, 2025
  • Client: Altek for Harsco
  • Site: Bahrain
  • Application:
    • Aluminium recycling plant
    • Aluminium salt dryer and reactor off-gas abatement
    • >99% removal of dust
    • >98% removal of NH3
    • >90% removal of PH3
    • Gas flowrate: 38,000m3/hr
Most popular related searches

Equipment scope:

  • Design, supply, delivery of
  • Main plant: high energy, variable throat venturi (316SS and GRP), cyclone separator (GRP), ammonia scrubber, (GRP) with recirculation pumps (PP), pipework and valves (cPVC) and instrumentation, fan (316SS) and storage tanks
  • Reactor plant: demister and carbon filter (GRP) Year delivered: 2020