Long Chain Reclaim (LCR)

Muskeg, Alberta - Case Study

SHARE
Apr. 26, 2024

In-situ remediation was performed using Bio-Reclaim as a result of a pipeline leak over 14 hectares of land in Muskeg, Alberta. The application was performed without any ground disturbance and was extremely cost-effective. Once containment and recovery operations had been completed, Bio-Reclaim was applied to the affected areas and results were visible in just six days.

Most popular related searches
  • Location: Muskeg, AB
  • Service Type: In-Situ