Long Chain Reclaim (LCR)
2 Articles found
Long Chain Reclaim (LCR) articles
In-situ remediation was performed using Bio-Reclaim as a result of a pipeline leak over 14 hectares of land in Muskeg, Alberta. The application was performed without any ground disturbance and was extremely cost-effective. Once containment and recovery operations had been completed, Bio-Reclaim was applied to the affected areas and results were visible in just six days.
Apr. 26, 2024
Prior to treatment, there was a thick layer of crude oil on the surface of the water and the surrounding vegetation was dying/killed off. 90 days after treatment with Bio-Reclaim™, vegetation began to return and a clear remediation of the crude oil and bitumen had been completed.
May. 20, 2009
