Project Details: Located in the Jedney gas field. ~175km northwest of Fort St. John, BC, 22,000 tons of impacted soli, from historical operations and spill events, Hydrocarbon Impacts: BTEX, VPH and LEPH, Abandoned location surrounded by forested public lands.
Most popular related searches
contaminated soil excavation
spill event
contaminated soil
petroleum remediation
remote temperature monitoring
remote video monitoring
hydrocarbon BTEX
field gas
temperature monitoring
BTEX
Project Operations
- Impacted soil excavated and placed in 850 m3 ETC Treatment cell
- The second treatment cell was constructed while treatment was underway on the primary cell
- LPG is used for burner fuel
- Treatment cell turnaround times ranged from 4 to 6 days per cell
- 24/7 remote temperature and video monitoring ensure treatment goals were reached
Planned Customer Results
- The treatment was successfully completed in approximately 6 months.
- All post-treatment samples were below the required standards
- Treatment commenced in the rainy season and ran into the extreme cold of January
- Liability was removed and closure was achieved at the site