Project Details: Oil well soil contamination, Phase one of the project consisted of 4800 cubic meters of soil remediation.

Mar. 13, 2026

Project Details: Legacy WWII-era former refinery site containing extremely high concentrations of heavy hydrocarbon waste, including free product tar, Located in the middle of the City of Whitehorse, and surrounded by residential communities as well as commercial & industrial development.

Mar. 13, 2026

Project Details

The objective of the pilot is to demonstrate the effective treatment of soil contaminated with PFAS by thermal desorption and off-gas destruction using Iron Creek’s Tech Zero remediation technology.

Mar. 13, 2026

Project Details: Legacy wellsite and remote sump remediation, Site impacts a result of historical drilling operations, Site located on First Nations land located near Waterton Lakes National Park in Southwest Alberta, Remedial activities consisted of site preparation, soil handling and thermal soil treatment.

Mar. 13, 2026

Project Details: Located in the Jedney gas field. ~175km northwest of Fort St. John, BC, 22,000 tons of impacted soli, from historical operations and spill events, Hydrocarbon Impacts: BTEX, VPH and LEPH, Abandoned location surrounded by forested public lands.

Mar. 13, 2026

Project Details

Iron Creek Group partnered with Jacobs and Battelle to demonstrate that Tech Zero could remediate high concentrations of PFAS chemicals from soil using conduction and convection.

Mar. 13, 2026

Project Details

Formerly known as Ravenna Army Ammunition Plant (RVAAP), ammunition was produced for the U.S. military during World War II, the Korean War, and the Vietnam War.

Mar. 13, 2026

Project Details

2,325.79 Tons of soil was treated. Soil was contaminated with M-55 stab detonators, hydrocarbons, and explosives residues.

Mar. 13, 2026

Project Details: 2,000 tons of impacted soil, , Diesel range organic contamination (up to 22,000 mg/kg), Soil type: gravel to tight clay with high moisture content, Very limited infrastructure was onsite.

Mar. 13, 2026

Project Details: Located at pipeline transfer station west of Edson, Alberta, 11,000 tons of impacted soil from historical operations and spill events, Hydrocarbon impacts: BTEX, VPH and LEPH, Active pipeline area with the pending expansion of Trans Mountain Pipeline.