Petroleum Remediation, Edson, Alberta, Canada - Case Study

SHARE
Mar. 13, 2026

Project Details: Located at pipeline transfer station west of Edson, Alberta, 11,000 tons of impacted soil from historical operations and spill events, Hydrocarbon impacts: BTEX, VPH and LEPH, Active pipeline area with the pending expansion of Trans Mountain Pipeline.

Most popular related searches

Project Operations

  • Impacted soil excavated and placed in two 850 m3 ETC Treatment cells
  • LPG is used for burner fuel
  • High levels of ambient Benzene required customized treatment
  • Treatment cell turnaround times ranged from 4 to 6 days per cell
  • 24/7 remote temperature and video monitoring ensured treatment goals were reached

Planned Customer Results

  • The treatment was successfully completed in approximately 6 months
  • All post-treatment samples were below required standards