Project Details: Located at pipeline transfer station west of Edson, Alberta, 11,000 tons of impacted soil from historical operations and spill events, Hydrocarbon impacts: BTEX, VPH and LEPH, Active pipeline area with the pending expansion of Trans Mountain Pipeline.
Most popular related searches
contaminated soil excavation
contaminated soil
pipeline project
spill event
petroleum remediation
remote temperature monitoring
remote video monitoring
hydrocarbon BTEX
pipeline locating
temperature monitoring
Project Operations
- Impacted soil excavated and placed in two 850 m3 ETC Treatment cells
- LPG is used for burner fuel
- High levels of ambient Benzene required customized treatment
- Treatment cell turnaround times ranged from 4 to 6 days per cell
- 24/7 remote temperature and video monitoring ensured treatment goals were reached
Planned Customer Results
- The treatment was successfully completed in approximately 6 months
- All post-treatment samples were below required standards
- Contingent liability was removed