CMC Solutions, LLC
  1. Companies
  2. Products
  3. DC Bead - Embolic Drug-Eluting Beads

Project - UAE Refinery - Oil and Gas

SHARE
Aug. 20, 2021

Capacity: 500,000 Barrels per day
A major oil and gas operator in UAE contracted CMC to deliver and certify 28 PEMS and 3 CEMS along with a mobile CEMS for compliance on their refinery stacks. A SmartCEMS PEMS was started-up to record the operating and emission data in September of 2008 for all of the units. A data acquisition system was provided by Honeywell Xceed and was started-up to record the operating and emission data in the October of 2012. The DAS collects the process and gas flow data for the compliance monitoring system. The system utilizes the signal from the gas flow monitor and other boiler parameters and the results of test data to calculate emission rates

Most popular related searches