Long Chain Reclaim (LCR)

Rainbow Lake, BC- Case Study

SHARE
May. 20, 2009

Prior to treatment, there was a thick layer of crude oil on the surface of the water and the surrounding vegetation was dying/killed off. 90 days after treatment with Bio-Reclaim™, vegetation began to return and a clear remediation of the crude oil and bitumen had been completed.

Most popular related searches
  • Date: May 20, 2009
  • Location: Rainbow Lake, BC
  • Service Type: In-Situ