Bertin Instruments
premium

4 Articles found

Articles

indicates free access

  • Bruce Power (Canada) Gamma Monitoring System - Case Study

    Bruce Power (Canada) Gamma Monitoring System - Case Study

    System description and operational performance after first winter period 2014/2015 The Bruce Power nuclear power plant (NPP) in Ontario, Canada, is the largest nuclear generating station in the world, operating 8 nuclear reactors producing 6300 MW. ...

  • Plant area monitoring at Krško

    Plant area monitoring at Krško

    Post-Fukushima upgrades at Krško in Slovenia (www.nek.si) are being implemented in accordance with the requirements of the national regulator and the plant owners. The first phase, including a passive containment vent filtering system and ...

  • Precellys application focus cancer research oncology - case study

    Precellys application focus cancer research oncology - case study

    Cancer research laboratories working with tumor tissues derived from animal models (1,2) or xenografts (3) face difficulties in homogenizing these tough samples using traditional methods (4). The Precellys homogenizers provides high speed sample ...

  • Precellys application focus forensic - case study

    Precellys application focus forensic - case study

    Forensic laboratories working with hard samples such as hair [1, 2J, bone [3], teeth, skin, etc. experience difficulties with DNA extraction due to the high energy needed to grind these tissues. Moreover, biological evidence is available in small ...