A uranium mill in the western United States uses sulfuric acid in the extraction process. The remaining byproduct is then stored in a tailings disposal cell. The liquids are acidic with a pH between 1 and 2. Project Details Uranium Mill Tailings ...
In May 2018, a drilling contractor started the installation of 570 (6” diameter x 500ft deep) geothermal boreholes in Edmonton, AB, Canada. The project at the former Edmonton Municipal Airport started with 2-rigs drilling in a formation of ...
Project Details Bloomington Manufactured Gas Plant Horizontal Remediation Well Location Grand Rapids, MI Products Used Puregold Cleandrill Northern Illinois Gas entered into an agreement with the Illinois Environmental Protection ...
Project Details Port of Morrow Irrigation Wells Location Boardman, OH Products Used DPA Port of Morrow operates a port on the Columbia River near Boardman, OR. In addition to port management, Port of Morrow operates farms in the ...
Project Details Potash Corp Rocanville West Expansion Contractor: RECON Location Potash Corporation of Saskatchewan Inc. (Potash Corp) Products Used Premium Gel Bentonite Drilling Slurry and Additives Background: The Potash ...
Project Details Suffolk County Water Authority Town Line Road Pumping Station Well No.2 Products Used LBA DPA Smithtown, NY – The Suffolk County Water Authority on Long Island, NY understands the importance of maintaining a ...
Location East Rutherford, New Jersey Products Used Organoclay MRM A national remediation contractor was tasked with the construction and operation of a groundwater treatment system for a large excavation site in East Rutherford, NJ. The site owner ...
LOWE’S in Ithaca, NY – A total of 115,000 square feet of the LIQUID BOOT Gas Vapor Barrier was installed, as specified by ElectroMech Engineering, to protect the structure, which was situated on a former landfill site, from the threat of ...
Project Details King Abdulaziz Center for World Culture Design Engineer: Architect – Snohetta General Contractor: Saudi Oger Limited Location Dhahran, Saudi Arabia Products Used COREFLEX The King Abdulaziz Center for ...
Project Details Oklahoma State University T. Boone Pickens Stadium Location Stillwater, OK Products Used Ultraseal HydroShield Quality Assurance Program After receiving a record breaking $165 Million donation from alumnus T. ...
Project Details Piper Tech Center City of Los Angeles Location Los Angeles, California Products Used COREFLEX 60 The Piper Tech Center in Los Angeles is a City of LA owned and operated building that among other enterprises houses ...
Location Cambridge, MA Products Used Coreflex Ultraseal Swelltite Voltex Ds Waterstop-Rx Hydroshield Quality Assurance Program Challenge: High Hydrostatic conditions, hundreds of slab penetrations, poor site and weather conditions.
Project Details University of California Berkeley Boalt Hall Location Berkeley, CA Products Used COREFLEX HydroShield Quality Assurance Program University of California Berkeley’s Boalt Hall has an iconic name. A law ...
Construction on the bridges across many rivers in the low country of South Carolina has been needed for along time. As with 90% of our nations’ bridges, these bridges have deteriorated from salt corrosion and age. Outdated for today’s ...
Project Details I-35W Bridge Location Minneapolis, Minnesota Products Used SHORE PAC Drilling Slurry and Additives Slurry Engineering Services On August 1, 2007 the eight-lane I-35W Bridge over the Mississippi River had ...
Project Details Mullica River Bridge Contractor: Ground Testing Inc. Location Prot Republic, New Jersey Products Used Shore Pac Drilling Slurry and Additives Slurry Engineering Services The Mullica River Bridge is the largest ...
Project Details New Central High School Geothermal Heat Pump System Contractor: Morrison Inc. Location York, PA Products Used Geothermal Grout The new 230,982ft2 facility for New Central York High School is relying on a renewable ...