Columbus Water Works (CWW)

Columbus Water Works (CWW)

Columbus Water Works (CWW)

Columbus Waterworks supplies drinking water and provides wastewater treatment to the Columbus area including Fort Benning as well as parts of Harris and Talbot Counties. As an organization, CWWhas a clear vision and mission to not only sustain the current level of sen/ice but improve it for future generations. We are reaching for extraordinary heights, setting a goal for ourselves of being the nation`s best provider of utility services. This means not only integrating the delivery of safe water and collection ofwastewaterforthe more than 230,000 residents of the Columbus region, but providing future generations with a legacy of responsible environmental stewardship of the middle Chattahoochee River watershed.We are excited about the possibilities, and look forward to working in partnership with you to make Columbus a community among the best!

Company details

1421 Veterans Parkway,P.O. Box 1600 , Columbus , Georgia 31902-1600 USA
View in map

Find locations served, office locations, manufacturers and our distributors.

Business Type:
Service provider
Industry Type:
Water Treatment
Market Focus:
Nationally (across the country)

Columbus Water Works (CWW) has the vision to be an outstanding provider of utility services, dedicated to protecting the environment, aspiring to new opportunities and compelled to excel in service to our community. Integrating the delivery of safe water and collection of wastewater for the 230,000 residents of the Columbus, Georgia region, CWW is dedicated to providing future generations with a legacy of responsible environmental stewardship of the middle Chattahoochee River watershed.

At the turn of the 20th century, citizens of Columbus were unhappy with their water supply and were pressing for a public water system. There were both quality and reliability issues associated with the private water system. The private system was failing to meet the growth needs of the city. Initial efforts for a public water system in Columbus, Georgia came from cisterns and crude pumps as early as 1839. The first community water system was built in 1849. A marker identifying the location of the spring was placed by the Waterworks on Country Club Drive in 1989. During this era, priorto the creation of the Board of Water Commissioners, pipes were made of hollowed, wooden logs and much of the water leaked from the pipes before it reached downtown.A study performed in 1898 by a prominent civil engineer recommended the Chattahoochee River as the source of water supply.

The original water treatment plant was constructed in 1915, with further additions and modifications added throughout the years. Portions remaining of the original facility include the #2 sedimentation basin and the #2 clearwell. Facility upgrades and modifications from original construction occurred in 1941,1944,1957,1961,1965,1972,1977,1986,1988,1989, 1991, and 1995. Maintenance of the buildings has always remained a top priority. As a result, building infrastructures remain in excellent condition. Also, plant personnel are dedicated to utmost operation, maintenance and cleanliness of plant process, equipment, buildings and grounds.In 1956, the Board of Water Commissioners assumed responsibility for the sanitary sewer system. The Water WorKs began the wastewater program with no treatment system. The first plant was built in 1964 and currently operates as a modern treatment facility which serves the entire community.

Our Mission
Provide our community a safe and dependable drinking water supply, enhance our water resources by collecting and treating wastewater, and promote a legacy of responsible economic and environmental stewardship

Our Vision
To be an outstanding provider of utility services, dedicated to protecting the environment, aspiring to new opportunities and compelled to excel in service to our community.

Strategies:

  1. Enhance Customer Satisfaction
  2. Strengthen Regional Potential
  3. Leverage Information Technology
  4. Optimize Infrastructure Performance
  5. Develop Sustainable Workforce
  6. Maintain Financial Stability

Water Main Move 1937Water is crucial to the development of any community, and Columbus residents found various sources of water in the area long before the city's official inception in 1828. The city's first official source was Leonard Spring (also known as Garrard Spring) then some three miles outside of Columbus. In 1839, a series of hollowed out pine logs carried water into the city, and faucets were installed at several intersections. People would come with pitchers, buckets, and whatever else would hold water, paying 5 cents a vessel for the privilege. In 1989, a marker identifying the location of the spring and impoundment was placed by CWW on Country Club Road.

At the turn of the 20th century, citizens of Columbus were unhappy with their water supply that was by that time coming from a private company. There were both quality and reliability issues, and it was also failing to meet the growth needs of the city. Residents began pressing their officials for a public water system. City leaders approached the Georgia General Assembly and achieved successful passage in 1903 of a bill that created the Columbus Board of Water Commissioners to manage a system owned by the City of Columbus. The Board settled on the Chattahoochee River as Columbus' water source, constructed a water treatment plant and installed distribution mains.

The original water treatment plant was constructed in 1915, with further additions and modifications added throughout the years. Portions of the original facility still remain, including the Number Two sedimentation basin and the Number Two clearwell. Facility upgrades and modifications from original construction occurred in 1941, 1944, 1957, 1961, 1965, 1972, 1977, 1986, 1988, 1989, 1991, and 1995. Maintenance of the buildings has always remained a top priority, and as a result, building infrastructures remain in excellent condition. Also, plant personnel are dedicated to utmost operation, maintenance and cleanliness of plant process, equipment, buildings and grounds.

In 1956, the Board of Water Commissioners assumed responsibility for the sanitary sewer system. Columbus' wastewater treatment plant, built in 1964, was among the first in the state of Georgia. When constructed, it treated approximately 80 percent of the city's sewage, while a second smaller treatment plant handled the rest. The South Columbus Water Resources Facility, currently receives all of the wastewater flow from the entire community and operates as a modern secondary treatment facility.

In 1992, Columbus became one of the first cities in the country to have a Riverkeeper group, an organization committed to river protection. CWW helped found the group and has been involved with it ever since. The Columbus Riverkeeper monitors an 80-mile stretch of the Chattahoochee River from West Point Lake to Fort Gaines, and works to educate the community on protecting the river.

Also in the early '90s, CWW launched a Master Plan for water and sewer services focusing on combined sewer overflow (CSO) issues. CSOs can occur during wet weather events such as heavy rainfall when stormwater (the runoff from parking lots and rooftops) mixes with wastewater in the combined piping system. This additional volume of flow can exceed the capacity of the system, resulting in the discharge of partially treated or untreated wastewater into a body of water. The Master Plan consolidated 16 CSOs into two treatment facilities and allowed for the development of the City's signature park, Riverwalk. Now a well-recognized destination for visitors and local residents alike, the Riverwalk area demonstrated CWW's commitment to not only addressing an environmental challenge, but also giving something back to the Columbus community in the form of a recreational area and scenic attraction.

CWW's role as a leading force in the community continues into the 21st century. In 2003, local and state leaders gathered for the groundbreaking of an innovative process CWW developed for creating Class A biosolids called CBFT3 (Columbus Biosolids Flow-Through Thermophilic Treatment). The biosolids are a beneficial by-product of the wastewater treatment process that can be used to enrich soil. CWW received a U.S. patent for this process, and then donated it to the Water Environment Research Foundation (WERF) in 2005 to benefit the entire industry.


After years of negotiating, CWW acquired the Fort Benning water and wastewater systems in 2004. Under the 50-year contract, CWW is working on upgrading the military base's systems and linking them to the existing Columbus water treatment and wastewater treatment plants.

CWW also continues to lead in regional water issues, working with other communities and collaborating with other states to ensure a viable water supply for the entire area.