Norair Engineering Corp. articles
New pumping facility and additional carbon storage tanks for the Washington Suburban Sanitary Commission.
Wastewater Pump Station consisting of a 40ft deep wetwell and drywell with 3- 250 hp pumps, generator and odor control.
Construction of a new building for two (2) 3000 ton chillers, a new cooling tower and chilled water pumping station.
Renovate an existing wastewater plant to include methanol feed, aeration improvements and pump replacements.
Pressure washing and cleaning of the Third High Reservoir for DC Water and the Army Corps of Engineers.
The project required a 40ft. deep excavation in rock, shoring, dewatering and construction of a sewage pump station in Loudoun County, VA.
Installation of six (6) new cooling towers and condenser water pumps for the US Government.
Hand tunneling operation for the installation of a 36" watermain serving the Minor Hill Reservoir.
Interior gallery view of the pumps for the 10 MGD pump station built in Wheaton, MD.
Renovation of an existing wastewater plant to include methanol feed, denitrification filters, a pump station and electrical improvements.