Polymer and Water Requirements. Obtain drum or tote of polymer from Spinpro. Obtain polymer make up unit from Spinpro. Provide 110 VAC to power ‘neat’ polymer pump. Provide flooded suction to polymer pump and sufficient flex tubing from pump discharge to polymer injection point. Provide min. 30 psig water pressure to polymer make down unit. Raw water for make down of polymer must be of potable water quality with total alkalinity less than 250 ppm as CaCO2 (if polymer solution is to be stored). Provide sufficient raw water flow to accommodate polymer make down and post dilution requirement. Post dilution water if higher than .05% solution is used.