Babcock & Wilcox Vølund AB
- Home
- Companies & Suppliers
- Babcock & Wilcox Vølund AB
- Downloads
- Multifunctional ADIOX Scrubber with ...
Multifunctional ADIOX Scrubber with Condensation/Heat Pump Afer a Semi-Dry System Brochure
Multifunctional ADIOX® scrubber with condensation/heat pump after a semi-dry systemÖresundskraft Filborna WTE plant, Helsingborg, SwedenThe new 70 MW Waste-to-Energy plant, Filborna in Helsingborg, Sweden, was taken into operation in October 2012.Götaverken Miljö was contracted to supply a multistage scrubber system to be positioned after a semi-dry gas treatment system. The unit includes stacked scrubber sections for removal of ammonia and remaining acidic components as well as recovery of energy by flue gas condensation. An absorption heat pump system provides for optimal efficiency. The scrubber, of tower packing type, includes packing material and droplet sepa-rators of ADIOX®-material for maximum dioxin removal and dioxin «memory effect» prevention.GÖTAVERKEN MILJÖ AB Visiting address: Anders Carlssons gata 14Postal address: Box 8876, SE-402 72 Göteborg, SwedenTel: +46(0)31-50 19 60 Fax: +46(0)31-22 98 67www.gmab.se- a Babcock & Wilcox Vølund companyFlue gas cleaningThe multi-stage scrubber installed in series with the semi-dry system will guarantee extremely low pollutants’ emission levels. Wet gas treatment processes are the most efficient and due to the high buffer capacity in this system it will provide an additional safety function in case of up stream process distur-bances. Residual ammonia from the SNCR- system is remo-ved. The effluent water is treated in a state-of-the-art water treatment system which includes ultra-filtration and reverse osmosis. The scrubber is equipped with ADIOX® tower packing and droplet separators in order to provide a guarantee that the dioxin emission levels are kept during all periods of operation.Energy recoveryThe energy recovery process is designed in order to maximize the energy output with minimum investment in a heat pump system. This is achieved in a two stage condensing system where in the first stage the flue gas is cooled by the return district heating water and in the second stage by an absorption heat pump.Mechanical designThe scrubber process water circulation piping as well as down stream flue gas ducts are all fabricated in fibre reinforced plastics for maximum corrosion resistance .Götaverken Miljö’s delivery to Filborna, Helsingborg.AlstomDouble NIDMultifunctional scrubber District heating systemHeat pumpProcess specifics:• Flue gas flow (after boiler): 130 000 Nm3/h, w. g.• Boiler rating: 70 MW• Flue gas condensation: 15 MW• Removal of: HCl, SO2 and NH3The multistage scrubber structure is based on a patented design where the process water circulation tanks are integrated inside the scrubber structure, requiring no external water circulation tanks. The result of this design is not only a minimum foot-print, i.e. minimum space required, but a consequence is also minimum energy consumption in the process water circulation pumps.Other suppliers
Most popular related searches
