E-Flux
  1. Companies & Suppliers
  2. E-Flux
  3. Downloads
  4. Standard - 4" Direct Push & Stabilizing ...

Standard - 4" Direct Push & Stabilizing Tensors - Installation guides

Keep the traps upright. • The travel blank should not be opened. • Turn off the irrigation system a week before deployment. • Avoid saturated soils and/or standing water. • Traps are moisture-resistant but not waterproof. Keep dry. • Keep the traps capped unless deployed. • The recommended deployment period is 14 days with a deployment range of 3-28 days.

Most popular related searches