Boralit
  1. Companies & Suppliers
  2. Boralit
  3. Downloads
  4. Wastewater Treatment Brochure

Wastewater Treatment Brochure

Product category B WATER TREATMENT Vlarem II Décret wallon Agrément wallon EN 12566-3 Boralit products category B – Water treatment Version 2013 v3 - English 2 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.1 WATER TREATMENT FROM 2 TO 30 POPULATION EQUIVALENTS (P.E.) 3 B.1.1 INDIV WATER TREATMENT MONOBLOC FROM 2 TO 8 P.E. Activated sludge 3 B.1.2 INDIV WATER TREATMENT MONOBLOC FROM 2 TO 7 P.E. moving bed 4 B.1.3 INDIVIDUAL WASTEWATER TREATMENT IN CONFORMITY WITH AGREMENT WALLON activated sludge 5 B.1.4 INDIV WATER TREATMENT SYSTEMS FROM 8 to 30 P.E. activated sludge 6 B.1.5 REPLACEMENT PARTS 7 B.1.6 OPTIONS 7 B.1.7 HOW DOES AN INDIVIDUAL WATER PURIFICATION SYSTEM WORK 8 B.1.8 STANDARDS 8 B.2 SAMPLE PIT 9 B.3 INSTALLATION PROCEDURE, MAINTENANCE AND WARRANTY FOR INDIVIDUAL WATER PURIFICATION 10 B.3.1 INSTALLATION PROCEDURES IN CONSOLIDATED SAND 10 B.3.2 INSTALLATON PROCEDURES IN SAND 12 B.3.3 MAINTENANCE 13 B.3.4 WARRANTY 13 B.4 APPENDIXES ON DEMAND 13 B.5 DIRECT NUMBERS 13 Boralit products category B – Water treatment Version 2013 v3 - English 3 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.1 WATER TREATMENT FROM 2 TO 30 POPULATION EQUIVALENTS (P.E.) B.1.1 INDIVIDUAL WATER TREATMENT MONOBLOC FROM 2 TO 8 P.E. ACTIVATED SLUDGE TECHNICAL DATA Type Volume Height Width Length Man-hole Height IN Diam pipe Height OUT Weight (kg) SC5/2 CE * 2.200 1.910 1.180 2.360 600 1.205 110 1.150 165 SC5/3 CE 3.300 1.910 1.180 3.540 600 1.205 110 1.150 235 SC8/2 CE* 3.200 2.250 1.290 2.580 600 1.445 110 1.400 185 SC8/3 CE 4.800 2.250 1.290 3.870 600 1.445 110 1.400 265 *Types with 2 tanks on request. Welded riser and cover standard included. Dimensions are in mm and informative. Subject to alterations. CHARACTERISTICS See individual water treatment installations : B.1.2.2 Type Number of inhabitants According to Energy pump Sludge recuperation Alarm Number of aerators SC 5/X CE 2-5 CE 1 x 40 W Standard Standard 1 SC 8/X CE 5-8 CE 1 x 50 W Standard Standard 1 X = 2 or 3 tanks K = RVS stainless steel pump housing included D = Boralit plastic pedestrian cover included DK = Boralit plastic pedestrian cover and RVS stainless steel pump housing included TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 4 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.1.2 INDIVIDUAL WATER TREATMENT MONOBLOC FROM 2 TO 7 P.E. MOVING BED TECHNICAL DATA Type Volume Height Width Length Man-hole Height IN Diam pipe Height OUT Weight (kg) SC 5 MB 4 x 1.100 1.900 2.360 2.360 600 1.285 110 1.155 330 SC 7 MB 4 x 1.600 2.250 2.580 2.580 600 1.450 110 1.320 370 Welded riser and cover standard included. Dimensions are in mm and informative. Subject to alterations. CHARACTERISTICS In the standard configuration, the system is composed of 4 tanks, i.e. 2 primary settling tanks (primary sedimentation), an aeration tank and a second settling tank (secondary sedimentation). The size of the tanks depends on the number of inhabitants (P.E.). With proper system selection, the purification results can meet the rigorous effluent disposal standards of VLAREM II, the Décret wallon, the Agrément wallon, and the EN 12566-3. All tanks come with standard risers. All the installations are equipped with a stainless steel housing with pump, control box and electro valve. TABLE OF CONTENTS Type Number of inhabitants According to Energy pump Sludge recirculation Alarm Number of aerators Supercompact 5 MB 2-5 EN12566-3 50 W Standaard Standaard 1 Supercompact 7 MB 5-7 EN 12566-3 80 W Standaard Standaard 1 Boralit products category B – Water treatment Version 2013 v3 - English 5 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.1.3 INDIVIDUAL WASTEWATER TREATMENT IN CONFORMITY WITH AGREMENT WALLON ACTIVATED SLUDGE TECHNICAL DATA Type Volume Height Width Length Manhole Height IN Diameter pipe Height OUT Weight (kg) SC 5/2 2 x 1.100 1.910 1.180 2.360 600 1.500 110 1.200 110 SC 5/3 1 x 3.300 and 2 x 1.100 2.200 and 1.910 1.610 and 1.180 2.390 and 2.360 600 1.500 110 1.200 180 & 110 SC 8/2 2 x 1.600 2.200 1.290 2.580 600 1.850 110 1.400 130 SC 8/3 1 x 6.000 and 2 x 1.600 2.500 and 2.200 2.070 and 1.290 2.400 and 2.580 600 1.850 110 1.400 270 & 130 Welded riser and cover standard included. Dimensions are in mm and informative. Subject to alterations. CHARACTERISTICS In the standard configuration, the system is composed of three tanks, i.e. primary settling tank (primary sedimentation), an aeration tank and a second settling tank (secondary sedimentation). If a sufficiently large septic tank of good quality is already present, the systems can be delivered without the primary settling tank. The size of the tanks depends on the number of inhabitants (P.E.). With proper system selection, the purification results can meet the rigorous effluent disposal standards of VLAREM II, the Décret wallon, the Agrément wallon, KIWA, and the PrEN 12566-3. All tanks come with standard risers. In general, one pump and 15 m of cable will be delivered. A Supercompact W5 and W8 are delivered with 2 pumps and 2 x15 m of cable. The energy consumption of the pump depends on the number of inhabitants and can be checked in the following table. TABLE OF CONTENTS Type Number of inhabitants According to Energy consumption pump Sludge recuperation Alarm Number of aerators Supercompact 5 2-5 Décret wallon 2 x 40 W Standard Standard 1 Supercompact 8 5-8 Décret wallon 2 x 50 W Standard Standard 1 Boralit products category B – Water treatment Version 2013 v3 - English 6 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.1.4 INDIVIDUAL WASTEWATER TREATMENT FROM 8 TO 30 P.E. ACTIVATED SLUDGE TECHNICAL DATA Type Volume Height Width Length Manhole Height IN Diameter pipe Height OUT Weight WZ12/3 CE 2.400 L 1.850 1.350 2.350 600 1.220 110 1.180 110 WZ16/3 CE 3.300 L 2.210 1.610 2.390 600 1.500 110 1.450 188 WZ22/3 CE 6.000 L 2.470 2.070 2.400 600 1.850 125 1.800 278 WZ30/3 CE 6.000 L 2.470 2.070 2.400 600 1.850 125 1.800 278 Type Volume Height Width Length Manhole Height IN Diameter pipe Height OUT Weight WZ12/2 CE 2.400 L 1.850 1.350 2.350 600 1.220 110 1.180 110 WZ16/2 CE 3.300 L 2.210 1.610 2.390 600 1.500 110 1.450 188 WZ22/2 CE 6.000 L 2.470 2.070 2.400 600 1.850 125 1.800 278 WZ30/2 CE 6.000 L 2.470 2.070 2.400 600 1.850 125 1.800 278 Welded riser and cover standard included. Dimensions are in mm and informative. Subject to alterations. The measurements are per tank. CHARACTERISTICS Check individual water treatment systems monobloc. Type Number of inhabitants According to Energy consumption Sludge recuperation Alarm Number of aerators WZ12 CE 8-12 EN12566-3 80 W Standard Standard 2 WZ16 CE 12-16 EN12566-3 100 W Standard Standard 2 WZ22 CE 16-22 EN12566-3 150 W Standard Standard 2 WZ30 CE 22-30 EN12566-3 200 W Standard Standard 4 Please contact our technical service to determine the correct number of inhabitants. TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 7 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.1.5 REPLACEMENT PARTS Parts Pump 40 W Pump 50 W Pump 60 W Pump 80 W Pump 100 W Pump 150 W Pump 200 W Concrete block Aerator disc Flexible/meter Alarm B.1.6 OPTIONS Type Stainless steel pump housing with alarm Maintenance contract Sample pit PE Sample pit PVC 110 Sample pit PVC 125 Cover for sample pit PVC Buffer pump with control box Buffer tank 3.300 litres Buffer tank 6.000 litres Boralit plastic pedestrian cover (Class A15) Telemetry (including GSM module, stainless steel housing, uninterruptible power supply, alarm) TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 8 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.1.7 HOW DOES AN INDIVIDUAL WATER PURIFICATION SYSTEM WORK All wastewater (black and grey, except rainwater) of the house flows into the first tank (the primary settling tank). If the distance is exceptionally long, or the amount of grease more than normal, a grease trap should be installed close to the house. For restaurants, etc. the installation of a grease trap is always recommended. In the first settling tank, the solid particles are stopped and gradually liquefied. Accidental dumping of small amounts of detrimental substances are partially taken care of in this tank. Liquid and suspended solids flow into the second tank. This tank is the aeration tank. Here, by means of one or more bubble aerators (see the table on page 3) oxygen is dissolved into the liquid obtaining optimal mixing and consumption of the biological waste. The pump of the Opur Supercompact works continuously, whereas it works intermittently in the WZ. The aerators can easily be removed and reinstalled (for inspection or cleaning) without having to empty the tank. The third tank is the second settling tank (secondary sedimentation). Here the sludge settles down and from this tank the purified water is discharged from the still water area. There is no need to add bacteries during the start-up of the system. OPTIONAL Alarm (standard with the WZ): functions by means of differential pressure, to be installed between the aerator and the aeration pump. Please contact our technical service to determine the correct number of inhabitants. At request, following information can be obtained: Description and users’ manual – Specifications – Maintenance contract – Functioning of alarm – Calculation of your system, … B.1.8 STANDARDS EXISTING STANDARDS (mg/l) Types Country BOD COD SS Ammonium N-total VLAREM II Flanders 25 125 60 - - Décret Wallon before 1/1/2009 Walloon provinces 70 180 60 - - Décret Wallon after 1/1/2009 Walloon provinces 30 125 40 - - KIWA klasse II The Netherlands 30 150 30 - - KIWA klasse IIIa The Netherlands 20 100 30 2 30 TUV Germany 20 75 50 10 - NF France 30 125 40 - - OBTAINED RESULTS Type According to BOD COD SS Ammonium N-totaal SC 5/3 CE/BE CE/VLAREM 9.4 66 12 - - Certificates to be obtained on request. TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 9 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.2 SAMPLE PIT TECHNICAL DATA Type A C D E F G H I Weight STP 600 480 400 320 110/125 180 310 110/125 6 STP PVC110X1000 1.000 - 315 255 110/125 135 - 110/125 10 STP PVC125X1000 1.000 - 315 255 110/125 135 - 110/125 10 Dimensions are in mm and informatory. Subject to alterations. CHARACTERISTICS Sample pits are designed to be installed in front or at the back of a water purification or separator. They have been provided with a type of spoon that is used for taking a sample of the influent and effluent. Before taking a sample the spoon should be cleaned to remove any collected sludge. The sample pit can be installed on a 110 or 125mm pipe. OPTIONS RISERS Type Height Diameter Weight VHSP600/420 riser in PE 420 570 8 Dimensions are in mm and informatory. Subject to alterations. TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 10 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.3 INSTALLATION PROCEDURE, MAINTENANCE AND WARRANTY FOR INDIVIDUAL WATER PURIFICATION The client acknowledges to have received a copy of this and agrees. The installation requirements should be read FIRST BEFOR placement. In the event of loss by the customer of the installation requirements the customer must always ask for a new copy of the installation requirements at Boralit nv, or download them from the Boralit Web site. For CE-installations it is mandatory to choose a contractor who has been approved of by Boralit. If not, please inform your contractor to get in touch with us. This is in order to get your recognition. B.3.1 INSTALLATION PROCEDURES IN CONSOLIDATED SAND They apply to the articles under categories B 1.3, B 1.4 and B 2. WHERE TO INSTALL? Find a place were the facility can be easily installed and where the drain of the house can be led. Check for enough fall to the drain of the infiltration-facility. Make sure there is no possible flow-back from flooding, high water, heavy rainfall. The pump(s) should be in a dry and well-ventilated place. At preference in a cellar, garage, shelter or a separate room. The standard delivered aeration pump can be installed up to 15 m from the aeration tank. In case there is a greater distance between the pump and the system, please contact us as this will require a pump with more power. It is also possible to install a special stainless steel pump housing (see B.2.5 options) near the wastewater treatment system. This way, the pump can be installed near the aeration tank and it will be protected against bad weather. What’s more, the pump will be easy to reach during maintenance of the system. TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 11 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com HOW TO INSTALL? ? Dig a square pit of adequate dimensions. See to it that all ground water present in the pit, is pumped out. Once the pit is dry, it must be covered by at least 10cm of consolidated sand (150 kg/m³). Make sure the sand is level so the tank is installed perfectly level to insure proper flow through the system. A concrete cap can be placed over the tanks to prevent tank floatation from groundwater pressure. ? Install the facility in correct order (tank 1: primary-sedimentation, tank 2: aeration tank, tank 3: secondary sedimentation). The arrows show the direction in which the water will flow. ? Connect the drain pipe of the house (if necessary, install a grease-trap between drain and wastewater treatment system) with the inlet of the facility (tank1: primary sedimentation). ? Connect the outlet of the wastewater treatment system with the drain pipe that goes to discharge or dispersal area, ... Make sure there is no flow-back possible. ? Connect the tanks (only for types WZ). ? Fill up the 2 (3) tanks with water through the first tank and let the water flow from the first tank through the other tanks until all tanks are filled with clear water. Attention: the secondary sedimentation tank (last tank) should be filled as follows: first fill the cone, then fill the outer part of the tank. At the same time backfill the pit round the tanks with consolidated sand (150 kg/m³) up to the level of the in-and outlet. ? Pull up the ballast-blocks from the aeration tank with the provided ropes. Screw the aeration discs on the provided screw thread and lower the blocks back into the tank. ? Saw the risers to the correct height to have them at ground level. ? Make sure there is adequate ventilation of the primary sedimentation tank and on the aeration tank. For this purpose the primary settling tank has been provided with a 50 mm pipe and a muff pipe DN100 (Ø110 mm) in the riser. Connect them to a T of 110 mm with reduction to 50 mm and lead the 110 mm to a well-ventilated place (For the Opur Supercompact the connection between tank 1 and 2 has already been made). Bring it to sufficient height above the ground and fix 2 curves 110 mm 90° to get a chimney-effect. ? Connect the aeration tube(s) and the aeration pump(s). For this, use a tube of 110 mm through which the aeration tube goes from the aeration pump to the manhole of tank 2. In case of several pumps, either pump can be put on either connection. ? Back-fill the pit with consolidated sand (150 kg/m³) to requested level. Remark: In case the facility gets embedded deeper in the ground than is permitted by the PE-riser, or in case one wants to make a manhole himself (e.g. brick-work) a support structure or concrete cap should be installed. This structure or cap should not rest on the tank nor on the brick-work and should divert the pressure to undisturbed ground. TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 12 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com BE CAREFUL In case any vehicles might drive in the immediate surroundings of the facility: ? A strong cover should be used e.g. pedestrians’ 50kN, vehicles 125 kN, trucks 250 kN or heavy weight vehicles 400 kN. ? The cover should be cast in a sufficiently strong, reinforced concrete slab (=pressure plate) to avoid any immediate pressure on the tanks (ask for information at a recognized technician or desk). The slab should rest on the ground around the pit that has not been churned. ? The PE covers which come standard with the wastewater treatment system cannot carry the weight of persons/vehicles passing above the system and have no lock. That’s why you should always install Boralit PE covers that are adapted to the persons/traffic passing above them and which can be locked. ELECTRIC CONNECTION ? Connect (Branch) the aeration pumps to a grounded receptacle (230V) in a well-ventilated, dry place. Make sure correct fuses guard the electrical circuit. ? In case of installation of an alarm, it should be branched to a second socket or fixed connection. This alarm should be put in one of the aerial tubes from the pump to the aerator. ADJUSTMENTS All of the systems should be adjusted. Which means that the present flow-taps (possibly one or more) that are in the manhole of the aeration tank, should be adjusted correctly. This adjustment is not difficult but will take some of your time: ? Make sure the pump(s) are electrically connected and no possible waste water can enter the tank (the water should be at rest, wait until no more water enters the installation) ? The flow-taps should be closed. Accurately open the taps just a little bit. ? Let the facility work for some hours and check the level of the liquid in the middle-tank. ? On the PVC tube of the airlift you will find 2 marks. If the liquid is between the marks, the taps are correctly adjusted. ? If the liquid is beneath the lower mark, the taps should be closed some more. If the liquid is above the upper mark, the taps should be opened some more. ? Wait again for some hours and check again. Adjust more if necessary until the liquid is at the desired level. B.3.2 INSTALLATION PROCEDURES IN REGULAR SAND They apply to the articles under categories B 1.1 and B1.2 Follow above instructions and If there is no groundwater, the consolidated sand can be replaced by regular sand. Please contact us if the tank becomes more deeply embedded in the ground than is permitted by the PE-riser. TABLE OF CONTENTS Boralit products category B – Water treatment Version 2013 v3 - English 13 Boralit N.V. - Nijverheidslaan 12 – 9880 AALTER – Belgium Tel.: +32 (0) 9 375 11 11 – Fax: +32 (0) 9 375 22 22 Site: www.boralit.com - E-mail: sales@boralit.com B.3.3 MAINTENANCE It’s possible to subscribe to a maintenance contract for annual check-ups. When the installation is not maintained as demanded by a Boralit maintenance service the user can not expect any longer that the installation will suffice to the normal demands. In that case we are not sure that the effluents will be as they have to be in conformity with environmental rules. If changements or maintenance are done by others than the Boralit maintenance service you can no longer expect that the installation will suffice to the quieries. B.3.4 WARRANTY We offer a 10-year warranty on all our products for manufacturing defects, except the aeration pumps and other electric or mechanical, … parts which carry a 2-year warranty. For the models Supercompact 5/2, 5/3, 8/2 and 8/3 its 25 years. Failure to comply with installation procedures and guidelines will void the warranty. The general sales and warranty conditions of Boralit count. B.4 APPENDIXES ON DEMAND Appendix B2: Opur Supercompact manual 5/3 and 8/3 Appendix B3: WZ description Appendix B4: Description and manual Opur Supercompact W5 and W8 Appendix B6: Description and manual Opur Supercompact 5 MB and 7 MB Appendix B8: Opur Supercompact 5/3 Manuel Appendix B9: Calculation of Pop. Eq. for wastewater treatment systems Appendix B10: Technical data for Opur Supercompact 5 Appendix B11: Technical data for Opur Supercompact 8 Appendix B12: Technical data for WZ12 Appendix B13: Technical data for WZ16 Appendix B14: Technical data for WZ22 Appendix B15: Technical data for WZ30 Appendix B16: Technical data for Opur Supercompact W5 Appendix B17: Technical data for Opur Supercompact W8 Appendix B16: Technical data for Opur Supercompact 5 MB Appendix B17: Technical data for Opur Supercompact 7 MB Appendix B20: Maintenance contract for wastewater treatment systems Appendix B22: Omnium maintenance contract for wastewater treatment systems B.5 DIRECT NUMBERS Sales T:+32 (0) 9 325 25 73 F:+32 (0) 9 375 22 22 Logistics: T:+32 (0) 9 325 25 70 F:+32 (0) 9 325 25 88 Accounting Department: T:+32 (0) 9 325 25 74 F:+32 (0) 9 325 25 89 BORALIT nv Nijverheidslaan 12 B-9880 Aalter - Belgium Tel.: +32 (0)9 375 11 11 Fax: +32 (0)9 375 22 22 E-mail: sales@boralit.be Site: www.boralit.com
Most popular related searches