Benenv - Jiangsu Benenv Environmental Protection Co., Ltd

BenenvCompact Wastewater Treatment System

SHARE

Industrial package mobile compact waste water treatment machine waste water treatment system sewage treatment plant.
Using international advanced membrane bioreactor technique ,and combined the membrane separation technique ,biotreatment technique ,and intelligent control technique .The production of the equipment is standard ,serial ,modularized .
The integrated and modularized product with the treatment capacity of 50m3/days,150m3/day,200m3/day can be easily installed,utilized immediately,and convenient to be moved,combine and assembled.

Most popular related searches

Appearance video

Fine workmanship, beautiful products, whole body stainless steel, frosting process, pay attention to details, only do boutique.
Reducer
Use Nissei or Nord brand reducers, industrial quality from Japan and Germany.

Mud inlet
The round-hole screen is used to prevent large particles and garbage from entering the dehydration body, reducing machine wear and improving machine service life.

7-shaped blade
The mixing is more complete and the flocculation effect is better.
Equipment construction

All pipes of the sewage treatment integration equipment are PVC pipes or stainless steel pipes, and the connections between pipes are bonded with PVC binder or welded with stainless steel. The packing USES the suspension type biological packing as the biological carrier, the biomass is big, hangs the film easily, does not knot the ball, does not block.

Installation and maintenance
  1. Foundation: If WSZ series equipment is placed above the floor, only a concrete floor with the same shape as the equipment needs to be prepared as the foundation. The foundation pressure must be greater than 4T/m2, and it should be horizontal and smooth. If the equipment is buried below the floor, the elevation of the foundation shall be less than or equal to the elevation of the equipment and no water is allowed to accumulate in rain.
  2. Installation: According to the installation diagram in place, each box in place in turn, the position and direction of the box should not be put wrong, spacing each other should be accurate, and connected to the pipeline. Fill the equipment with clean water and check whether there is any leakage in the pipes. If there is no leakage, cover the box with soil until the equipment checks the holes and level the ground. Connect the control line of the electric control box to the water pump, connect the electric control box to the power supply, pay attention to the fan, motor steering, and the direction indicated by the fan.

Buried sewage treatment technology has many advantages
  1. The equipment is buried under the surface, which can be afforested and the environment is beautiful.
  2. Generally, the whole equipment does not need special personnel to manage.
  3. The floor space can be reduced. Parking lots and other facilities can be built above the equipment.
  4. No impact on the surrounding environment, low sludge production, noise less than the standard of the second class area.
  5. Simple operation, new technology, good effect and long service life.
  6. The equipment can be arranged according to the standard or special arrangement according to the terrain.
  1. Hotels, restaurants and nursing homes
  2. Station, expressway service area, harbor wharf and ship
  3. Closed treatment system
  4. Factories, mines, troops, tourist spots and scenic spots