- Home
- Companies
- Enviro-USA American Manufacturer, LLC a ...
- Products
- Enviro-USA - Model 30 Inch - Coastline ...
Enviro-USA - Model 30 Inch -Coastline Fast Deployment Oil Containment Boom
10” Freeboard & 20” Draft. Ideal for fast response in Coastlines and Unprotected Ports as it offers a good size freeboard and skirt depth. Adapts well to currents, tide changes and wave action. Recommended to be stored, deployed and retrieved from a reel as it will occupy less space, less manpower and will allow for a fast deployment (1000 ft in 8-10 minutes).
What is a 30″ Coastline Fast Deployment Oil Containment Boom and who is it for?
This Enviro-USA boom is ideal for Coastlines & Unprotected Ports as it offers a high freeboard and good skirt depth.
Why use Fast Deployment Oil Containment Booms versus Standard Booms?
Oil containment booms are used in coastal waters as a first response to an oil spill or by Spill Response Contractors to divert, control and maintain an oil spill. Once the spill has been contained the contractor will then proceed to recover and clean up the oil. The main advantage of using a Fast Deployment boom is the reduced time it takes to deploy thanks to the use of a reel system.
Where are 30″ Fast Deployment Oil Containment Booms used? The 30 inch model is most commonly used in:
- Unprotected Ports
- Harbors
- Gulfs
- Beaches
- Coastlines
This Enviro-USA boom is compliant with OPA 90, US Coast Guard – OSRO and ASTM F1523 Guidelines.
- Oil Booms are available in 50 and 100 foot sections or any custom length up to 100′.
- Numerous sections can easily and quickly be connected together.
- Numerous fabrics are available for short or long term deployments.
8” Freeboard & 16” Draft, 22 oz. PVC fabric, top tension cable, ballast chain, and ASTM connectors.
Enviro-USA’s 24” FAST DEPLOYMENT oil containment boom is ideal for fast response in unprotected ports as it has a flat float, its light weight, does not require inflation, stores and deploys from a reel thereby occupying less space, less manpower and 1,000 ft can be deployed in 8-10 minutes. It has a top tension cable which provides great tensile strength, which is required in most ports due to strong currents, tide changes, windy conditions and choppy water. This is a great product for fast deployment.
