Water Technology Engineering Ltd. (WTE)

FilterPodEco-Electric Wastewater Treatment Plant

SHARE

The FilterPod sewage treatment plant has also been tested at the EN Test Centre using artificial ventilation.

Most popular related searches
  • The air is pulled through the FilterPod using a low energy 3 watt fan contained in a fan housing box. The fan box is Eco-Electric fanfitted between the FilterPod and the Settlement Tank pulling air through the RDX media and blowing it back into the settlement tank.
  • The air then uses the normal soil vent pipe on the house wall to exit the system.
  • Because the soil vent pipe is no longer acting as a chimney to draw the air through the FilterPod, it does not matter how far away it is from the plant.
  • You do not need any other vertical pipe-work other than that normally found as part of a house drainage system.
  • The fan uses around £5/year in electricity, which some may think is a small price to pay in order to eliminate the tall vent pipe from the FilterPod.