- Home
- Companies
- Qingdao Yimei Environment Project ...
- Products
- Yimei - Packaged Sewage Treatment Plant
Yimei - Packaged Sewage Treatment Plant
nt operation experience at home and abroad ,combine our company’s scientific achievements and engineering practice, designed a whole set of organic wastewater treatment equipment which can be buried underground, which adopted the advanced technique and manufacturing technology at home and abroad 1n late of 1990s,produed the LHC series of sewage treatment equipment, which main raw material is fiberglass, stainless steel, its main purpose is make the domestic sewage and similar industrial organic sewage to achieve user`s emissions standards after disposed by this equipment. This equipment mainly used in treating domestic sewage in Residential area (including villa district)? senior hotel ?complex office and various of public hospital buildings, the water quality can achieve national emission standard after treated by the equipment. A full set of equipment can be buried in the ground, is also known as "integrated waste water treatment equipment." .
- the sludge concentration higher, ordinary sludge concentration is the 5~10 times activated sludge process,the sludge quality concentration in aeration pond can reach 30~40g/L.
- no easy blocking, no need backwashing and backflow.
- as suspended padding of the process core with the aerobic and anaerobic me- tabolism, can better denitrification and dephosphorize. MBBR technique feature
- small occupy area,Large amount of activity of microorganisms
SIMPLE OPERATION AND LONG USE
simple operation,stable opera- tion,usually do not need special management
BIOLOGICAL SUSPENDED CARRIER WITH SUPERIOR PERFORMANCE
Internal high porosity, large specific sur- face area, strong adsorption ability, mi- crobial adhesion easily Degradation of organic matter, nitrogen and phosphorus Easily fluidization, high utilization rate of oxygen
AERATION SYSTEM WITH SUPERIOR PERFORMANCE
Aeration performance superior easy to maintain
Aeration pipe without block- ing,easy to maintenance
LOW OPERATING COSTS MBBR
biofilm process does not need sludge backflow and backwash, reducing equip- ment investment, easy to op- erate, and reducing the cost of sewage operation
Install mode: On the ground or underground
- Voltage: Can be customized as client request
- Size: 11.6x2.2x2.5m
- Control mode: Manualand PLC remote control
- Function: Reduce 95% CODcr and BOD5
