Bigadan A/S

Pasteurization Tanks

SHARE
As standard, Bigadan designs biogas plants with pre-pasteurization steps, where the biomass is heat treated at 70°C (158°F) for 60 minutes before degassing giving the following advantages: Observing EU`s bi-product directive 1069/2009, 10-20% increase in gas output, Increased dehydration for degassed biomass/sludge. Additionally, Bigadan`s pasteurization tanks are used at commercial sewage treatment plants for sludge pasteurization. We handle all aspects of the tank construction, including design, erection and commissioning.