SENSOR DDS MIT technology was developed specifically for the quality control of exposed geomembrane liners such as synthetic membranes / liners, or asphalt. Even where the damage is less that 1mm² the equipment will generate an audio visual alarm to warn the Technician that damage has been encountered. It is employed directly after the installation of a liner. The system electronically verifies the integrity of the entire surface including the welds. This enables us to find all defects (e.g. caused by transit, or following trades) down to pinhole d damage.

Most popular related searches
  • All geomembrane liner installations should be thoroughly tested to ensure that complete integrity exists, prior to the placement of any covering media over the liner.
  • Defects in new liner installations are nearly always caused by following trades, testing therefore protects both the client and the installation contractor.
  • The standard quality control systems normally offered by liner installation contractors concentrate on installation defects. These controls will miss damage to the liner, particularly 3rd party damage.
  • SENSOR DDS MIT technology will detect even the smallest pinhole of damage, but it cannot be used once the liner is covered.
  • Transferred responsibility - Sensor takes responsibility for geomembrane integrity issuing a certificate accordingly, taking responsibility and therefore reducing your liability.
  • Low cost - The cost Sensor’s geomembrane integrity control is trivial when compared with the potential cost repairs and risk of consequential damages post-completion.
  • No installation needed - This method requires no permanent site installation, it is a very quick and reliable way to control quality to ensure no damage remains after installation of a geomembrane.
  • Flexibility - One Sensor technician can control 10 000m² of the geomembrane per day. We can engage up to five technicians and can therefore survey 50 000m² per day, so your project will never be late.