The pilot was developed to evaluate the effects of large volumes of dissolved oxygen in SLSWA`s leachate lagoon. The lagoons effluent is sent to the Fort Pierce Utilities Authority in 35,000 Gal `slugs` where it is tested, and a surcharge applied for BOD/COD readings above 1000Mg/L.

Most popular related searches

Several elements collectively defined the pilot test, including the following:

  • Test the performance of Taeraton system`s ability to transfer dissolved oxygen in SLSWA`s leachate lagoon.
  • Test the performance of Taeraton system`s ability to reduce BOD levels and effectively produce effluent that meets Fort Pierce County`s standards.
  • Test the performance of Taeraton system`s ability to reduce COD levels and effectively produce effluent that meets Fort Pierce County`s standards.

Pilot Specifications

  • Location: St. Lucie, FL SWA
  • Date: Jan 31, 2007
  • Containment: 1M Gallons
  • Pre AIA - BOD Levels: 1500 mg/l
  • Pre AIA - COD Levels: 7400 mg/l
  • Pre AIA - DO Levels: none
  • Equipment Installed: 2 five HP Gould`s centrifugal pumps with Baldor motors
  • 4 AIA750 Taeration Nozzles
  • Certified Lab Testing Facility: Fort Pierce Utilities Authority

Energy Efficiency (5 HP Taeration System)

  • FLOW RATE THROUGH NOZZLE: 180,000.00
  • GPD MIXING RATE: 21.6m/gpd
  • GALLONS MIXED PER HOUR: .9M
  • LBS OF O2 DELIVERED PER HOUR: 60.66
  • LBS OF O2 TRANSFERRED PER HOUR: 6.67
  • SOTE %: 11%
  • Kw/H: 5.0
  • LBS O2 DELIVERED PER KILOWATT: 12.132
  • LBS OF O2 TRANSFERRED PER KILOWATT: 1.34