1-2-3 Solution Services

SHARE
The 1-2-3 concept is special developed for upgrading within the paper industry but can of course be used within different industries. Upgrading can be carried out in approximate 12-20 days boiler stop time. The below example shows upgrading of an electrostatic precipitator with concrete casing. The precipitator is placed on the top of a boiler building. The 1-2-3 concept can also be employed for precipitator with steel casing.