FERRER
  1. Companies
  2. FERRER
  3. Services
  4. Groundwater Control For Engineering ...

Groundwater Control For Engineering Works

FromFERRER
SHARE

When it is required water table depletions over than 5 meters, mainly in excavations in which there is some kind of diaphragm (sheet piling, screens, plastic walls ..), in soils of low to moderate permeability, it is required in-depth catchments wells. The condition of low to moderate hydraulic conductivity require a greater number of wells, distributing into many low rate flow or pumping units, thus allowing the use of low power pumping equipment, optimizing costs, mainly those related to energy.

Most popular related searches

This distribution reduces the hydraulic gradients required, and therefore, the lower speeds flows guarantees less soil erosion, minimizing the potential impact on the environment.

  • Low capacity wells
  • High capacity wells
  • Wellpoint
  • Sump pumping