ADS Environmental Services

Master Planning

SHARE

A master plan includes a prioritized list of proposed improvements and a master plan map. Proposed improvements are based on modeling results. ADS Pipeline Services" experienced engineers use the calibrated model to simulate critical future conditions. When the model predicts unsatisfactory performance with the existing system, improvements are designed on a trial basis.

Most popular related searches

The existing system is used to full advantage in all simulations.  Accurate data from field measurements ensures that the model correctly simulates existing pipes and pumps.  Maximizing use of the existing system minimizes the cost of improvements.  Storage requirements are evaluated and various storage alternatives are investigated, including both elevated and ground storage.  Modeling engineers check tank performance for future conditions. Redundancy and reliability are considered in the design of proposed improvements, as well as operational flexibility.

When deficiencies are identified, alternative methods of solving problems will be tried and compared. Economical solutions are identified, with consideration given to innovative solutions for the entire service area at build-out. The experience of ADS Pipeline engineers produces practical solutions that work in the real world. Proposed improvements will enable the system to meet design criteria for fire protection, service pressure, velocities, and pump and tank performance. The strategic plan prioritizes the improvements and includes cost estimates for each item. Operation and maintenance costs are included.