ECOS
Supervision on Mounting of Sewage Treatment Plants and Equipment
FromECOS
Before delivery of the equipment to the site some preparatory construction works must be performed. For STP modular unit it is required to build a concrete balance tank and concrete basement, to input engineering networks like sewage pipeline, water pipeline and electric power line in accordance with the design documents.
