Chemical Data Management Systems, Inc (CDMS)

Wastewater Discharge Permitting Services

SHARE

All dischargers of industrial wastes are required to obtain a permit from the Environmental Compliance Section.CDMS will evaluate the Client’s Industrial Wastewater to determine if an Industrial Wastewater Permit Application is required by the local POTW. 

Most popular related searches

This will include:

  • Obtaining industrial wastewater samples from the Client’s facility.
  • Having the samples analyzed by a certified laboratory to determine the contents and concentration of contents of the wastewater.
  • Comparing analysis results to the requirements of the POTW.  This may include discussions with the POTW to determine requirements specific to the Client’s facility.