AGREM LLC
  1. Companies
  2. AGREM LLC
  3. Software
  4. AGREM - Design Process Software

AGREMDesign Process Software

SHARE

Our goal in water management design is to give you the options you need to make the best decision for your farm. To do so, we have a multiple step process that includes our expertise and your feedback. First, we gather soil and survey data for your field. Next, we prepare a series of preliminary maps showing different water management options for your consideration. We then work with you to modify those preliminary designs to develop a water management system that meets your goals for the lowest possible cost. The final plans are then developed for installation by you, your local contractor, or an AGREM Professional Contractor.

Most popular related searches

The steps of an AGREM design:

  • Survey
  • Gather soil information and field specifics
  • Develop multiple preliminary water management plans
  • Modify plans with your feedback
  • Develop final plans for installation
  • Installation