Groundwater Profiling
Articles & Whitepapers
-
Rainwater harvesting for a government facility in Amberley, QLD - Australia - Case Study
In Amberley is one of the largest base facilities in Australia. The redevelopment works are valued at AU$331.5 million. New construction and refurbishment works to be undertaken include new living-in accommodation, maintenance facilities, storage, working and training accommodation, a combined mess and a new physical fitness centre. The site is owned by anAustralian Government Department. The ...
-
Development of in-house lattice-Boltzmann simulator of bioreactors for wastewater treatment: basic concepts and initial results
While computational modelling has increasingly supported wastewater bioreactor engineering, novel numerical techniques have been developed such as the lattice-Boltzmann method (LBM). With vinasse ...
News
-
Non-PFAS Highlights from REMTEC 2019
I had the pleasure of attending REMTEC 2019 in Denver last week. As always it was great to catch up with colleagues and hear about new developments in our industry. While much of the discussion centered around the looming challenges of PFAS ...
Equipment & Solutions
-
Showcase
Pump Control Valve
The valve isolates pumps from the system during pumps starting and stopping to protect pipe lines and pumps itself. The valve is equipped with a control solenoid valve that is switched on at pump starting and is able to fulfill pipe line gradually, reducing pressure rising peaks and allowing soft starting of the pump with closed outlet. The valve controls pump stopping as well, gradually closing ...