Ecol-Unicon

Project - Construction of the EPS pumping station in Ciechocinek

SHARE
Aug. 21, 2021
Courtesy ofEcol-Unicon

Project Description
Construction of a pumping station for the Water Park in Ciechocinek. Due to the location of the pumping station, it was made to a high quality and visual standard.

Pumping Station:

pumping station parameters:

  • flow [Q] = 1.38 l / s
  • lifting height = 4.25 [m]
  • hydraulic system:
    • submersible pump IS 50 T (CAT.NO. A414-050-0004-06) P1 / P2 = 0.495 / 0.37 kW, In = 0.9 A - 2 pcs.
    • piping DN 50 made of steel 1.4301, connected on flanges (PN = 10 stainless steel)
    • soft-sealed valve DN 50– 2 pcs.
    • ball check valve DN 50 - 2 pcs.
    • parallel operation of pumps, technological sewage
    • EU control cabinet, mounted on the tank cover. Equipped with, among others with SG / 25S / 0-4 / L = 10m hydrostatic probe + SG type handle, 2 floats. Optical and acoustic signaling of emergency states.
  • concrete chamber:
    • diameter 1500 mm
    • height h = 4.9 m
Most popular related searches
  • Location: Ciechocinek
  • Ordering Company: KM Inwestycje Sp. z o.o
  • Date: 2020