Upgrades For FLSmidth Airtech
1-2-3 Solution Services
The 1-2-3 concept is special developed for upgrading within the paper industry but can of course be used within different industries. Upgrading can be carried out in approximate 12-20 days boiler stop time. The below example shows upgrading of an electrostatic precipitator with concrete casing. The precipitator is placed on the top of a boiler building. The 1-2-3 concept can also be employed for precipitator with steel casing.
Electrostatic Precipitator
Upgrading a precipitator can be an economically attractive possibility if:. . the mechanical or electrical equipment are worn out. the production is increased. the emission requirements are made more rigorous. there has been a change of fuel or raw material.