- Home
- Companies
- InduMar Products, Inc.
- Products
- InduMar - Model Stop It - Gas Riser ...
InduMar - Model Stop It -Gas Riser Rehabilitation Kit
The STOP IT Gas Riser Rehabilitation Kit is intended to strengthen the structural integrity of the riser nipple, or riser casing on non-leaking 3/4" and 1" standard anodeless risers. It is comprised of a strong knitted fiberglass tape coated with fast setting, water-activated urethane resins. The STOP IT Gas Riser Rehabilitation Kit also includes FIX STIX®. a steel filled hand moldable epoxy that sets rock hard in only 20 minutes.
Materials
The STOP IT- Gas R:ser Rehab:::tation Kil is a necessary item in an inventory of products for minimizing corrosion-felated operating costs.
Kit Includes
Kit Contents:
- STOP IT® knitted fiberglass tape precoated with water-activated polyurethane resins
- FIX STIXS hand moldableepoxy
- Gloves for easy clean up
- Detailed directions
How It Works
The STOP IT® Gas Riser Rehabilitation Kit is intended to strengthen the structural integrity of the riser nipple, or riser casing on non-leaking 3/4" and 1" standard anodeless risers
Flexibility
improves efficiency of utility field personnel and has reliable installation quality that reduces shutdowns or relights.
- Shelf Life: 2 years from date of purchase
- Temperature/Heat Resistance: From -20°F up to 250aF (-29BC to 121 °C) - continuous. From 250°F to 5008F (121 aC to 260eC) - intermittent
- Set Time: Tack free in 3 - 5 minutes at ambient temperatures of 50aF to 80SF (luBC to 27°C)
- Cure Time: Cures in 30 minutes at temperatures between 50SF to 80aF (10BC to 27°C)
- Tensile Strength: ASTM D 3039.24.950 PSI/in width/172 MPa
- Flexural Yield Strength: ASTM D 790-1-B. 12.005 PSI (844 kg/cm2)
- Durometer Hardness: ASTM D 2240.63 (Shore D)
