econ industries services GmbH

Hazardous waste treatment solutions for site remediation - Soil and Groundwater - Site Remediation

SHARE

The contamination of soils as a result of prior chemical production can often be unpredictable and diverse. The majority of such pollutants will require an ex-situ treatment method. Many of our VacuDry units can be used for direct-feeding contaminated soils. To reduce the input amount for thermal treatment, the VacuDry units can also be used in combination with soil-washing plants: In this case, customers only feed the high polluted fractions and screened fines (e.g. below 10 mm), as well as the filter-cake from the soil washing process. However, we are able to handle soil contaminated with mercury, hydrocarbons, PAH, PCB, dioxins, furans, organic-lead compounds and many more. VacuDry plants for on-site ex-situ remediation projects are delivered in a modular design.

Most popular related searches

This allows easy movement of the system after completion of the remediation job for further use. Because of the negligible process emissions, VacuDry can be operated safely in a residential area. For temporary projects, we offer a renting solution. Read more in the “Rent a VacuDry“ section.

Key Facts

  • Technology: VacuDry vacuum distillation, possible in combination with soil washing
  • Throughput capacity: Up to 10 t/h thermal treatment capacity; in combination with soil washing up to 50 t/h
  • Input material: Soils and building rubble contaminated with hydrocarbons, VOC, POP, PAH, lubricants, mercury organic lead compounds etc.
  • C10-C40 output: Below 1 %, < 0.1 % possible – according to EN 14039
  • Mercury output: < 1 ppm
  • Heating system fired by: Fuel oil, diesel, natural gas, biofuels, recovered mineral oil fraction

Greatest Benefits:

  • Almost 20 years of proven experience operating vacuum distillation units to treat contaminated soils and building rubble
  • Pioneering unique patented vacuum-distillation solutions, frequently used since 1998 for challenging remediation projects in the chemicals industry
  • Flexible, skid-mounted and modular VacuDry plants with mobilisation times of between 1 and 3 months (depending on plant sizes)
  • VacuDry remediation technology always meets local EPA requirements
  • Negligible emissions; approved to operate in residential neighbourhood areas
  • Optional operation of VacuDry plants on-site by econ industries´ engineers

Contact supplier

Drop file here or browse